Studio Design Protocol
Conceptual Design Phase
- Work with client to determine goals for sound
quality, décor/ finish and budget
System Design and Specification Phase
- Research engineer seating position
- Acoustically calculate, evaluate and design control room and studio
space
- Design monitoring system placement
- Design HVAC system for appropriate
NC levels
- Design electrical system
- Design lighting scheme and control
- Help client choose fabric, carpet and other finish work
- Conduct telephone
and on-site meetings with client, electricians, HVAC personal, construction
personal, fabric installers, drywall installers, carpet installers,
lighting personal, to determine design and costs
Build Stage
- Project
Management – Coordinating and
overseeing all phases of build to insure all tasks are performed
to specifications
- Sound system calibration
Comissioning
- Client tutorial
and handover Final client approval
Carl
Tatz Design:
6666 Brookmont
Terrace, Suite 1109,
Nashville, TN 37205,
615.354.6242 / carl@carltatzdesign.com
|